When I drove by Monday evening I was shocked to see a garage door. That typically meant "lock down" or that something big was happening inside that they didn't want people to steal. I didn't have time to go in that night but finally made it back on Wednesday.
You can not imagine my surprise when I saw the changes that had happened between Friday and Wednesday:
Garage door installed! |
Railings on the stairs. Wood will be stained to match the cabinets. |
Kitchen cabinets. Cabinets were also in the bathrooms and laundry room. |
Doors installed. Also notice the walls have been sanded and primed. |
Chair railing and wainscoting in the dining room installed. |
Double tray ceiling in our bedroom finished. |
One counter top installed in the kids bathroom. |
Trim installed. Both base boards and trim around the doors and windows. |
When Matt went back by yesterday they had installed about 75% of the electrical boxes, outlets and light switches, throughout the house and had painted the baseboard.
Makes you wonder what is going to take so long that it won't be finished before the end of February doesn't it??
No comments:
Post a Comment